Parks and Trails in Ghaf Woods
Majid Al Futtaim plans 8 km of walking trails and a 3.5 km mountain bike and running loop through Ghaf Woods, around a central forest with a botanical garden, children's and sports parks, a skate park, courts and forest pools, and a cycle path toward the Al Qudra track. Its sustainability report puts the forest at about 75,865 sq m and all planted ground at about 189,776 sq m. On Nov 15, 2026 none of it was open to residents: the first homes are targeted for late 2027.
Next: the tree the forest is built around, which cluster sits beside which park or the schools planned nearby.
The trails, in Majid Al Futtaim's figures
| Trail or space | Size or length | Where it is stated |
|---|---|---|
| Walking trails and forest pathways | 8 km | Launch release, Jun 5, 2024; "Enchanted Forest" on ghafwoods.com |
| Mountain bike loop, also for running | 3.5 km | Launch release; "Mountain Bike Loop" on ghafwoods.com |
| Forest area | About 75,865 sq m | 2025 Sustainability Report |
| All vegetated landscape | About 189,776 sq m | 2025 Sustainability Report |
| Open space per resident | 15 sq m | Launch release |
| Trees | More than 35,000 | Launch release |
The launch release also says the furthest point of the community is a five-minute walk away and that it will be home to more than 20 bird species. The 2025 Sustainability Report names some of them (Collared Doves, Kentish Plovers, Black-winged Stilts) and adds that cars are kept to a perimeter boulevard with parking underground, so the paths inside are for people on foot and on bikes.
What the masterplan marks
The interactive masterplan on ghafwoods.com and the legend in the Lacina brochure label these outdoor places. Majid Al Futtaim gives a description for only some of them, and no size for any:
- Central Forest and Central Native Forest, the dense planting at the middle of the site
- Forest Pathways and Forest Trails, the 8 km network
- Mountain Bike Trail, the 3.5 km loop
- Botanical Garden
- Children's Park and Nature Play, which the site describes as kids' nature gardens with "nature inspired playgrounds"
- Sports Park (in the brochure, the Sports and Activities Park) and Multi Purpose Courts
- Skate Park
- Forest Bridge, which the Lacina brochure says only Lacina's residents may use
- Forest Pools, "embellished into the verdant landscape"
- Wellness and Yoga Pavilion
- Qudra-Barari Cycle Path, a link marked at the community's edge
Clusters add their own: Lacina a lawn, pet areas, a bike station and a multi-purpose sports park beside it; Capria edible gardens where residents pick fruit and vegetables, by their pages on ghafwoods.com.
How the forest is being grown
The sustainability report says more than 10,000 trees of 40 species were being raised in a nursery before planting out, by the Miyawaki method of dense, mixed native planting. The landscape is to be watered with treated sewage effluent and recycled greywater, with no drinking water used for irrigation, and Majid Al Futtaim says the canopy can cool the outdoors by up to 5 degrees Celsius against the areas around it. Those are the developer's design aims, not measurements of a finished forest.
The link to Dubai's cycle network
The report says Ghaf Woods' cycling routes and bike loop "connect to Dubai's wider cycling infrastructure", and the masterplan names the Qudra-Barari path. The Dubai Media Office describes the Al Qudra track as 135 km from the Al Barari area to Bab Al Shams. Majid Al Futtaim has not published where its path meets that track or when the link opens.
Until the community's own parks open, these are the nearest larger ones by our route check on Nov 15, 2026 through the OSRM routing service (OpenStreetMap roads, no traffic), from the spot Google Maps pins as "Ghaf Woods Dubai | By Majid Al Futtaim" (25.07961, 55.31409):
| Place | What it offers | By road, our check |
|---|---|---|
| Al Qudra Cycle Track, parking at Al Yalayis 1 | The 135 km desert track, with 18 km and 50 km loops | 14.1 km, 17 min |
| Mushrif Park | A forest of 70,000 trees with a mountain bike track, its first 20 km built | 28.8 km, 45 min |
Both descriptions are from the same Media Office release. On those figures Mushrif's forest has twice Ghaf Woods' planned trees; we think a family who wants long rides or hikes should still plan on driving to one of these, and use Ghaf Woods' loop for the daily run.
To get Lyra's price list and floor plans, register on the home page.
Sources
- Majid Al Futtaim announces its latest real estate development, Majid Al Futtaim, Jun 5, 2024, read Nov 15, 2026: 8 km of trails, 3.5 km bike loop, pools, yoga pavilion, five-minute walk, 20 bird species, 15 sq m per resident
- 2025 Sustainability Report, Majid Al Futtaim, read Nov 15, 2026: forest and vegetated areas, Miyawaki nursery, irrigation, cooling, cars at the perimeter, link to the cycle network, late 2027 first phase
- Ghaf Woods official website, Majid Al Futtaim, read Nov 15, 2026: masterplan labels and amenity descriptions
- Lacina and Capria, ghafwoods.com, read Nov 15, 2026: each cluster's outdoor spaces
- Lacina brochure, Majid Al Futtaim, read Nov 15, 2026: masterplan legend, Lacina's forest bridge, pet areas and bike station
- Dubai's state-of-the-art cycling tracks, Dubai Media Office, Jan 23, 2022, read Nov 15, 2026: the Al Qudra track's length and loops; Mushrif's trees and mountain bike track
- OSRM demo server, Project OSRM, routes run Nov 15, 2026: distances and times on OpenStreetMap roads, no traffic; places from OpenStreetMap; the start pin from Google Maps